home *** CD-ROM | disk | FTP | other *** search
/ Space & Astronomy / Space and Astronomy (October 1993).iso / mac / TEXT / SPACEDIG / V13_0 / V13_010.TXT < prev    next >
Internet Message Format  |  1991-06-28  |  30KB

  1. Return-path: <ota+space.mail-errors@andrew.cmu.edu>
  2. X-Andrew-Authenticated-as: 7997;andrew.cmu.edu;Ted Anderson
  3. Received: from beak.andrew.cmu.edu via trymail for +dist+/afs/andrew.cmu.edu/usr11/tm2b/space/space.dl@andrew.cmu.edu (->+dist+/afs/andrew.cmu.edu/usr11/tm2b/space/space.dl) (->ota+space.digests)
  4.           ID </afs/andrew.cmu.edu/usr1/ota/Mailbox/8bW0JAy00VcJ4:x04Q>;
  5.           Mon,  7 Jan 1991 00:21:17 -0500 (EST)
  6. Message-ID: <UbW0Ifu00VcJQ-vE5U@andrew.cmu.edu>
  7. Precedence: junk
  8. Reply-To: space+@Andrew.CMU.EDU
  9. From: space-request+@Andrew.CMU.EDU
  10. To: space+@Andrew.CMU.EDU
  11. Date: Mon,  7 Jan 1991 00:20:45 -0500 (EST)
  12. Subject: SPACE Digest V13 #010
  13.  
  14. SPACE Digest                                      Volume 13 : Issue 10
  15.  
  16. Today's Topics:
  17.   KSC rounds out 1990 with success and prepares for 1991 (Forwarded)
  18.  
  19. Administrivia:
  20.  
  21.     Submissions to the SPACE Digest/sci.space should be mailed to
  22.   space+@andrew.cmu.edu.  Other mail, esp. [un]subscription requests,
  23.   should be sent to space-request+@andrew.cmu.edu, or, if urgent, to
  24.              tm2b+@andrew.cmu.edu
  25.  
  26. ----------------------------------------------------------------------
  27.  
  28. Return-path: <space-request+@andrew.cmu.edu>
  29. X-Andrew-Authenticated-as: 0;andrew.cmu.edu;Network-Mail
  30. Date: 28 Dec 90 22:35:30 GMT
  31. From: trident.arc.nasa.gov!yee@ames.arc.nasa.gov  (Peter E. Yee)
  32. Organization: NASA Ames Research Center, Moffett Field, CA
  33. Subject: KSC rounds out 1990 with success and prepares for 1991 (Forwarded)
  34. Sender: space-request@andrew.cmu.edu
  35. To: space@andrew.cmu.edu
  36.  
  37.  
  38.           Bruce Buckingham
  39.           407/867-2468                                      Dec. 28, 1990
  40.  
  41.           KSC RELEASE NO. 205 - 90
  42.  
  43.  
  44.  
  45.           KSC ROUNDS OUT 1990 WITH SUCCESS AND PREPARES FOR 1991
  46.  
  47.  
  48.                In the world of Space Shuttles and payloads at Kennedy Space
  49.           Center, 1990 proved to be a year of numerable successes and
  50.           challenges. Six Shuttles were launched from and returned to KSC,
  51.           including one unplanned end-of-mission KSC landing. But
  52.           challenges ranging from liquid hydrogen leaks on Columbia (STS-
  53.           35) and Atlantis (STS-38) to a record number of launch delays on
  54.           mission STS-36 kept engineers and managers on the edge of their
  55.           seats.
  56.  
  57.                KSC began the year with a mission to retrieve the Long
  58.           Duration Exposure Facility (LDEF) and concluded with the ASTRO-1
  59.           observatory mission. Between these missions were the long
  60.           anticipated launch of the Hubble Space Telescope, the deployment
  61.           of the Ulysses spacecraft to study the polar regions of the Sun,
  62.           and two Department of Defense dedicated missions. Of the six
  63.           Shuttle's launched from KSC in 1990, three were nighttime
  64.           launches.
  65.  
  66.                All missions were scheduled to land at Edwards Air Force
  67.           Base, California. All but one did. Atlantis, returning from its
  68.           DOD mission in November, made an unscheduled but perfect landing
  69.           at KSC's Shuttle Landing Facility. This was the first KSC end-of-
  70.           mission landing in over five years and it demonstrated the
  71.           ability of the KSC landing crews to prepare for a dramatic
  72.           touchdown with little notice.
  73.  
  74.                Challenging the launch team and hundreds of support
  75.           personnel this summer were elusive liquid hydrogen leaks on the
  76.           orbiters Columbia and Atlantis. After four special tanking tests
  77.           and a rollback to the Vehicle Assembly Building for destack,
  78.           Altantis was finally cleared for launch on mission STS-38.
  79.  
  80.                Columbia, prior to mission STS-35, underwent four launch
  81.           scrubs, two rollbacks to the VAB, and two special tanking tests.
  82.           Special "leak-buster" teams ultimately were formed utilizing over
  83.           700 NASA and contractor employees, all with a "can-do" attitude,
  84.           to outfit Columbia's aft compartment with hazardous gas detectors
  85.           and cameras for the special tanking tests. Their hard work paid
  86.           off when all of the leaks were eventually pinpointed and
  87.           repaired.
  88.  
  89.  
  90.           1990 SPACE SHUTTLE MISSIONS:
  91.  
  92.  
  93.                The following is a brief summary of the 1990 shuttle
  94.           missions (all times are Eastern):
  95.  
  96.  
  97.           STS-32 -- Columbia was launched at 7:35 a.m. on Jan. 9. It landed
  98.           at Edwards Air Force Base, Calif., at 4:35 a.m. on Jan. 20.
  99.  
  100.           MISSION: The primary mission objectives were the deployment of
  101.           the SYNCOM IV-F5 Navy synchronous communications satellite and
  102.           the retrieval of NASA's Long Durations Exposure Facility (LDEF).
  103.           SYNCOM was successfully deployed on the second day of the
  104.           mission. Orbiter rendezvous with LDEF occurred on Jan. 12,
  105.           followed by the dramatic grapple by the Remote Manipulator System
  106.           and berthing in the payload bay for return to Earth. LDEF was
  107.           later returned to KSC where the 57 experiment trays housed on the
  108.           satellite were removed for inspection.
  109.  
  110.                LDEF had been stranded in space for over five years and was
  111.           in danger of burning up in the Earth's atmosphere if not
  112.           recovered soon. Its retrieval had been placed on hold following
  113.           the Challenger mishap.
  114.  
  115.  
  116.           STS-36 -- Atlantis was launched at 2:50 a.m. on Feb. 28. It
  117.           landed at EAFB at 1:09 p.m. on March 4.
  118.  
  119.           MISSION: This was the sixth mission totally dedicated to the
  120.           Department of Defense. Originally scheduled for launch on Feb.
  121.           22, Atlantis experienced six launch delays due to adverse weather
  122.           and illness of the crew commander.
  123.  
  124.  
  125.           STS-31 -- Discovery was launched at 8:33 a.m. on April 24. It
  126.           landed at EAFB at 9:49 a.m. on April 29.
  127.  
  128.           MISSION: The mission was devoted to the successful deployment of
  129.           the Hubble Space Telescope approximately 24 hours after launch.
  130.           HST is the first of the four great observatories which will aid
  131.           in astronomical explorations. HST is the largest telescope ever
  132.           put into space. It will be studying the universe in both visible
  133.           and ultraviolet light.
  134.  
  135.                The primary mirror on the Hubble Space Telescope is 94.5
  136.           inches in diameter. It is capable of detecting objects 12 to 14
  137.           billion light years distant and with at least 10 times the
  138.           clarity of ground based telescopes. Producing images at a rate of
  139.           about 20 a day and more than 7,000 a year, over 100,000 pictures
  140.           are expected to be taken over the telescope's 15 year life span.
  141.  
  142.                HST, however, is not without its problems. Shortly after
  143.           deployment and initial check out, it was discovered HST's primary
  144.           mirror had been made with a flaw, a spherical aberration. A
  145.           future Shuttle mission, planned for July 1993, is scheduled to
  146.           rendezvous with HST to correct the error.
  147.  
  148.                HST consists of five primary instruments: A high resolution
  149.           spectrograph, the wide field/planetary camera, the faint object
  150.           spectrograph, the high speed photometer, and the faint object
  151.           camera developed by the European Space Agency (ESA).
  152.  
  153.                For this mission, a significant modification was made to
  154.           Discovery's braking system with the installation of newly
  155.           designed carbon brakes on the main landing gear. These carbon
  156.           brakes are able to withstand longer distance braking and higher
  157.           braking temperatures of up to 2100 degrees F. The normal
  158.           temperature operating range is 1200 degrees F. for the older
  159.           beryllium brakes. The carbon brakes can be used for 20 or more
  160.           landings before replacement is needed, saving time for orbiter
  161.           turnaround processing. This a key step in making landings at
  162.           Kennedy Space Center a regular occurrence. Plans are underway for
  163.           the installation of carbon brakes on the remaining orbiters.
  164.  
  165.           STS-41 -- Discovery was launched at 7:47 a.m. on Oct. 6. It
  166.           landed at EAFB at 9:58 a.m. on Oct. 10.
  167.  
  168.           MISSION: The Ulysses spacecraft was deployed successfully from
  169.           Discovery about six hours after launch, embarking on a five-year
  170.           mission to explore the uncharted regions of the Sun's north and
  171.           south poles. The ESA-built explorer was boosted out of Earth
  172.           orbit using the attached IUS and PAM-S upper stages. Its initial
  173.           trajectory will take it out to the planet Jupiter for a
  174.           gravitational assist necessary to sling the 809-pound spacecraft
  175.           into it solar polar orbit. The Jupiter encounter is scheduled for
  176.           February 1992, south solar pole pass in June 1994, north solar
  177.           pole pass in June 1995, and end-of-mission in September 1995.
  178.  
  179.                Ulysses is the third interplanetary probe launched by the
  180.           Shuttle. The project is a cooperative endeavor between the
  181.           European Space Agency and NASA. Ulysses was designed and built by
  182.           the Federal Republic of Germany.
  183.  
  184.  
  185.           STS-38 -- Atlantis was launched at 6:48 p.m. on Nov. 15. It
  186.           landed at Kennedy Space Center at 4:43 p.m. on Nov. 20.
  187.  
  188.           MISSION: This was the seventh and final classified mission
  189.           totally dedicated to the Department of Defense.
  190.  
  191.                Atlantis was originally scheduled for launch in July 1990.
  192.           However, a precautionary liquid hydrogen tanking test conducted
  193.           at the pad on June 29 indicated a hydrogen fuel leak on the
  194.           external tank side of the orbiter/ET 17-inch quick disconnect
  195.           umbilical. Two subsequent liquid hydrogen tanking tests
  196.           determined the leak could not be fixed at the pad and the vehicle
  197.           was returned to the VAB on Aug. 9 for destack operations.
  198.           Atlantis was returned to the Orbiter Processing Facility and new
  199.           seals were placed in the 17-inch liquid hydrogen disconnect
  200.           umbilical. Meanwhile, a new external tank was attached to the
  201.           solid rocket boosters in the VAB. The Shuttle was returned to the
  202.           pad and a fourth tanking test was performed on Oct. 24. This test
  203.           proved the fix had stopped any significant leakage of liquid
  204.           hydrogen and the vehicle was cleared for flight.
  205.  
  206.           STS-35 -- Columbia was launched at 1:49 a.m. on Dec. 2. It landed
  207.           at EAFB at 12:54 a.m. on Dec. 11.
  208.  
  209.           MISSION: The payload aboard Columbia, ASTRO-1, consisted of four
  210.           unique, yet complementary, telescopes that captured the universe
  211.           in the ultraviolet and x-ray spectrums. Three telescopes were
  212.           dedicated to study the ultraviolet: the Hopkins Ultraviolet
  213.           Telescope, the Wisconsin Ultraviolet Photo-Polarimeter
  214.           Experiment, and the Ultraviolet Imaging Telescope. The Broad Band
  215.           X-Ray Telescope (BBXRT) was made for viewing in the x-ray
  216.           wavelength. The seven member crew divided into two shifts and
  217.           were able to operate the telescopes around the clock. The mission
  218.           was not without problems, however, when both instrument pointing
  219.           system data display units failed and pointing of the ultraviolet
  220.           telescopes had to be controlled from the ground. BBXRT was
  221.           unaffected and the quality of the ASTRO images continued to be
  222.           good.
  223.  
  224.                This was the first Shuttle mission to be controlled by three
  225.           NASA installations. Columbia was directed as usual from Mission
  226.           Control at Johnson Space Center, Houston Tx. But the three
  227.           ultraviolet telescopes in the observatory were directed from the
  228.           Payload Operations Control Center at Marshall Space Flight
  229.           Center, Huntsville, Al. The Broad Band X-Ray Telescope and its
  230.           separate pointing system were operated by a special team at
  231.           Goddard Space Flight Center, Greenbelt, Md.
  232.  
  233.                STS-35 was scheduled for a May 30 liftoff, but launch was
  234.           scrubbed when high concentrations of liquid hydrogen were
  235.           detected during propellant loading near the 17-inch umbilical
  236.           line connecting the orbiter and the external tank and in the
  237.           orbiter's aft compartment. After rollback to the Vehicle Assembly
  238.           Building and destack, the 17-inch liquid hydrogen umbilical was
  239.           replaced with the umbilical from the Shuttle Endeavour (currently
  240.           under construction in Calif.). Columbia was then returned to the
  241.           pad and prepared for another launch attempt in late August. Due
  242.           to a problem with the BBXRT payload, launch was delayed for six
  243.           days. During the tanking for launch attempts on Sept. 6 and Sept.
  244.           18, the liquid hydrogen leak again manifested itself in the
  245.           orbiter's aft compartment. A fix at the pad was attempted and the
  246.           subsequent tanking test on October 30 proved the repairs were
  247.           effective.
  248.  
  249.                Columbia awaited the launch of Atlantis on mission STS-38
  250.           from the adjacent pad and was then launched 17 days later.
  251.  
  252.  
  253.  
  254.           1990 NASA SUPPORTED EXPENDABLE VEHICLE MISSIONS
  255.  
  256.  
  257.                In addition to shuttle launches, NASA/KSC supported the
  258.           launch of ROSAT on a Delta expendable vehicle and the Combined
  259.           Release and Radiation Effects Satellite (CRRES) on an Atlas
  260.           Centaur.
  261.  
  262.                The following is a brief summary of these missions.
  263.  
  264.           ROSAT: Roentgen Satellite (ROSAT) Project is a cooperative
  265.           program involving NASA, the Federal Republic of Germany, and the
  266.           United Kingdom. The primary objectives of the ROSAT project are
  267.           to make a detailed all-sky survey of X-ray sources, and perform
  268.           detailed follow-up studies of some 1,000 of the anticipated
  269.           50,000 - 100,000 sources that will be detected in the survey.
  270.  
  271.                ROSAT was launched aboard an Air Force Delta II expendable
  272.           launch vehicle from Cape Canaveral Air Force Station Complex 17
  273.           at 5:48 p.m. June 1, 1990.
  274.  
  275.           CRRES: The Combined Release and Radiation Effects Satellite
  276.           (CRRES) is a joint NASA/U.S. Air Force mission to study the
  277.           effects of chemical releases on the Earth's ionosphere and
  278.           magnetosphere and to monitor the effects of space radiation
  279.           environment on sophisticated electronics. The CRRES satellite
  280.           will use chemicals released to briefly trace invisible magnetic
  281.           field lines and waves with luminous particles.
  282.  
  283.                CRRES was launched aboard a General Dynamics commercial
  284.           Atlas/Centaur (AC-69) expendable vehicle from Cape Canaveral Air
  285.           Force Station Complex 36 at 3:21 p.m. July 25, 1990.
  286.  
  287.  
  288.           ECONOMIC IMPACT
  289.  
  290.  
  291.                Again, KSC played a leading role in bolstering the local
  292.           economy. Space-related employment and contracts at KSC generated
  293.           a $1.37 billion boost to the Florida economy during fiscal year
  294.           1990. This represents an increase of about $132 million over the
  295.           previous year.
  296.  
  297.                Employment numbers at KSC also rose. Permanent federal
  298.           employees now number over 2,600. On-site contractors nudged the
  299.           12,700 mark while 3,250 individuals were employed through
  300.           construction and tenant jobs. All in all, the total number of
  301.           workers employed at KSC at the end of FY90 totaled approximately
  302.           18,500.
  303.  
  304.  
  305.           NEW FACILITIES AND MODIFICATIONS
  306.  
  307.  
  308.                A giant step was made this year in moving several thousand
  309.           KSC employees from made-over box cars, trailers and prefabricated
  310.           modules to a well equipped office building. In March, the
  311.           300,000-square-foot Operation Support Building (OSB) was official
  312.           dedicated and opened to over 1700 employees. The new OSB was
  313.           built by W&J Construction Corp. of Cocoa, Fla. at a cost of about
  314.           $28,000,000.
  315.  
  316.                Contained in the six-story facility, along with much needed
  317.           office space, are a technical documentation center, photo
  318.           analysis facility, technical libraries, multi-purpose conference
  319.           rooms, a barber shop, concession areas and a fully equipped
  320.           exercise facility.
  321.  
  322.                                     *   *   *   *
  323.  
  324.                Understanding a growing need many employees have at KSC, the
  325.           NASA/KSC Exchange Council reached an agreement with Tutor Time
  326.           International, Inc. for the design, construction, staffing and
  327.           operation of an employee child care center. The idea resulted
  328.           from an employee's suggestion and work by several organizations
  329.           and employees through a specialized committee set up to plan a
  330.           facility.
  331.  
  332.                Tutor Time was selected to operate the facility and
  333.           construction was completed this December. The single-story,
  334.           6,600-square-foot building will initially provide care for up to
  335.           140 children ranging in age from infants through preschoolers.
  336.           The facility will be open for operation Jan. 2, 1991.
  337.  
  338.                                     *   *   *   *
  339.  
  340.                Funds amounting to $3.2 million were also allocated to
  341.           complete the four-lane widening of Kennedy Parkway South (State
  342.           Road 3), one of KSC's busiest highways. Final Congressional
  343.           approval was received, paving the way for long awaited relief of
  344.           severe traffic congestion during rush hour. The ground breaking
  345.           occurred in November and construction is scheduled for completion
  346.           by mid-1991. This, coupled with Brevard County's commitment to
  347.           widen its portion of the much traveled Route 3, will help insure
  348.           KSC employees of a saver and quicker drive to and from work.
  349.  
  350.                                     *   *   *   *
  351.  
  352.                In February, a dedication ceremony for NASA's new Spacecraft
  353.           Solid Rocket Motor High Energy X-Ray Facility was held. This new
  354.           facility, located on Cape Canaveral Air Force Station, will be
  355.           used for a variety of high energy radiography testing, including
  356.           the capability to verify propellant integrity on spacecraft solid
  357.           rocket motors.
  358.  
  359.                The facility, which consists of a high bay exposure cell
  360.           with a reinforced concrete wall 6 feet, 7 inches thick,
  361.           represents a significant upgrade in KSC abilities to meet current
  362.           and projected new payload requirements. It was constructed at a
  363.           cost of $2.9 million.
  364.  
  365.                                     *   *   *   *
  366.  
  367.                At Kennedy Space Center's Spaceport USA, another ground
  368.           breaking took place. NASA and the Astronauts Memorial Foundation
  369.           began the construction of the monument titled, "Space Mirror,"
  370.           dedicated to the fallen astronauts who have lost their lives in
  371.           training and in space. In addition, an educational facility for
  372.           teachers and students will be constructed as a "living memorial"
  373.           to provide quality information and materials of instruction in
  374.           the field of aeronautics and space in support of America's space
  375.           program.
  376.  
  377.                 The projects will be funded in part by AMF's portion (50
  378.           percent) of the proceeds from the sale of Challenger license
  379.           tags. Additional funding will come from private and corporate
  380.           donations. The educational facility will be located adjacent to
  381.           the astronaut's memorial, scheduled for completion early next
  382.           year.
  383.  
  384.                                     *   *   *   *
  385.  
  386.                As a result of the series of liquid hydrogen leaks on the
  387.           orbiters this summer, an external tank/orbiter umbilical hydrogen
  388.           dispersion system was designed for installation on the three
  389.           mobile launcher platforms. The dispersion system is designed to
  390.           provide a nitrogen rich air flow around the hydrogen 17-inch
  391.           disconnect line between the orbiter and external tank. The system
  392.           will reduce hazardous concentrations of hydrogen should they form
  393.           during tanking operations and not be dispersed through normal
  394.           ambient conditions. Firing room personnel will be able to control
  395.           the dispersion system from the Launch Control Center.
  396.  
  397.  
  398.           SCIENCE AND TECHNOLOGY
  399.  
  400.                Technology transfer has always been important to managers at
  401.           KSC. NASA invests a great deal of time and resources toward the
  402.           goals of exploring the universe and finding better ways to live
  403.           and operate in the hostile environment of space. But unless this
  404.           technology is transferred to the everyday activities of life on
  405.           earth, the vast majority of the world's population will never
  406.           experience the practical applications of space technology.
  407.  
  408.                One example of this spin-off technology returned to KSC this
  409.           year. While designing an upgrade to the Space Station Logistics
  410.           and Resupply section of the Payload Support Building, engineers
  411.           concluded that space derived heat pipes would be applicable to
  412.           assist in lowering energy costs associated with cooling the
  413.           facility.
  414.  
  415.                Heat pipes were initially used as an efficient cooling
  416.           method for satellites in space. Later they were adapted to assist
  417.           in the air conditioning and dehumidification of earth-bound
  418.           buildings. Now, heat pipes will be used at KSC, and with a
  419.           substantial amount of energy savings.
  420.  
  421.                                     *   *   *   *
  422.  
  423.                Kennedy Space Center also continues to be a leader in the
  424.           fields of plant and medical research.
  425.  
  426.                The Controlled Ecological Life Support System (CELSS) has
  427.           distinguished KSC as a front runner in searching for ways to grow
  428.           plants in the microgravity environment of space. Earlier this
  429.           year, the Hanger 'L' Life Sciences Facility was expanded by
  430.           3,500-square feet. This additional room will allow the Biomedical
  431.           Operations and Research Office to upgrade research capabilities.
  432.  
  433.                An example will be the continued ability to "farm" proven
  434.           forms of space harvests such as lettuce and soybeans. It will
  435.           also provide additional capabilities for studying the closed
  436.           acquaculture system -- including a fish pond -- for use in future
  437.           long term space habitation.
  438.  
  439.                                     *   *   *   *
  440.  
  441.                NASA/KSC and the American Cancer Society continued a
  442.           cooperative cost sharing agreement to provide funding and
  443.           technology transfer to the University of South Florida, Tampa,
  444.           Fla., for research in cancer prevention, detection and treatment.
  445.  
  446.                Under a Memorandum of Understanding, NASA/KSC activities
  447.           include: make available necessary laboratories and equipment,
  448.           coordinate assistance from other NASA centers and outside
  449.           organizations; provide technical evaluations; and provide
  450.           qualified personnel to serve as project leaders.
  451.  
  452.  
  453.           MILESTONES REACHED
  454.  
  455.                In April, during the rollout of the Space Shuttle Columbia
  456.           from the Vehicle Assembly Building to pad 39-A for the launch of
  457.           STS-35 mission, Kennedy Space Center's Crawler Transporter number
  458.           2 passed the 1,000-mile landmark. Weighing in at over 3,000 tons,
  459.           it took the tracked vehicle 25 years to roll the odometer. At a
  460.           pace of less than two miles per hour over the past quarter
  461.           century, the giant transporter has been operated by 10 different
  462.           drivers and has supported Apollo, Skylab, and Space Shuttle
  463.           missions. The crawler transporter provided continuous service to
  464.           the nation's space effort in the four decades from the 1960s into
  465.           the 1990s.
  466.  
  467.                The crawler transporter was the dark horse in the
  468.           competition of concepts to provide a means to deliver the launch
  469.           vehicle from the assembly building to the pad. But in 1962,
  470.           following a full year of study, the cross-land tracked vehicle
  471.           was voted the most feasible. As the largest land vehicle ever
  472.           built, the six-million-pound, 131-foot-long, 114-foot-wide, and
  473.           20-to-26 foot adjustable height transporter has proven itself as
  474.           an invaluable asset to the space program.
  475.  
  476.                                     *   *   *   *
  477.  
  478.                Also celebrating a historic milestone were the American and
  479.           Soviet crew members of the Apollo-Soyuz Test Project. Their
  480.           reunion at KSC on July 26 marked the 15th anniversary of their
  481.           1975 flight. The ASPT mission was history's first international
  482.           joint manned space flight. The link-up of the Apollo and Soyuz
  483.           spacecraft occurred on July 17-19, 1975.
  484.  
  485.  
  486.           WHAT'S AHEAD
  487.  
  488.                As KSC ponders the future, 1991 seems to hold an abundance
  489.           of opportunity for the nation's space program. Two primary
  490.           payloads have already been delivered to the launch facility for
  491.           processing for missions next year. They are the four unclassified
  492.           DOD payloads for mission STS-39 and the Gamma Ray Observatory,
  493.           slated for mission STS-37.
  494.  
  495.                Next year NASA has scheduled seven Space Shuttle missions to
  496.           be launched from Kennedy Space Center and one expendable vehicle
  497.           launch from Cape Canaveral Air Force Station. The current
  498.           manifest calls for an Air Force Delta 2 to launch NASA's Extreme
  499.           Ultraviolet Explorer (EUVE) in early fall. This spacecraft will
  500.           identify, map, and catalog extreme ultraviolet sources in the
  501.           universe.
  502.  
  503.                The seven shuttle missions scheduled for 1991 are (in launch
  504.           order):
  505.  
  506.           STS-39  --  Discovery on a DOD unclassified mission. Payload: Air
  507.           Force Program-675 (AFP-675), designed to collect infrared data to
  508.           support Strategic Defense Initiative program; Infrared Background
  509.           Signature Survey (IBSS), designed to obtain infrared measurements
  510.           on rocket plumes, shortwave infrared Earth-limb, shuttle
  511.           environment, and chemical release from the payload bay while
  512.           detached in proximity to the Orbiter; Space Test Program (STP-
  513.           01), the first in a series of secondary experiments; Multi-
  514.           Purpose Experiment Canister (MPEC), an extended Hitchhiker-G, GAS
  515.           canister capable of deploying an internally stowed payload.
  516.  
  517.           STS-37  --  Atlantis will deploy the Gamma Ray Observatory (GRO),
  518.           the second in a series of four great observatories. GRO will
  519.           explore the most energetic part of the spectrum across a much
  520.           greater wavelength range than earlier observatories.
  521.  
  522.                The GRO will enable us to determine if most of the known
  523.           gamma radiation arriving from the universe originates in quasars
  524.           and pulsars, or whether there are other sources of gamma ray
  525.           emissions. The focus of GRO will be to investigate gamma ray
  526.           sources emitted by stars and distant galaxies.
  527.  
  528.           STS-40  --  Columbia will carry the Space Life Sciences
  529.           Laboratory (SLS-1) to investigate the effects of weightlessness
  530.           exposure using both man and animal specimens. (This will be
  531.           Columbia's last mission prior to being ferried to California for
  532.           extensive modifications. Modification operations are expected to
  533.           last about a year.)
  534.  
  535.           STS-43  --  Discovery will carry into orbit a NASA Tracking and
  536.           Data Relay Satellite (TDRS-E). This satellite is designed to
  537.           replace the partially functional TDRS west satellite currently in
  538.           orbit.
  539.  
  540.           STS-44  --  Atlantis will deploy a Defense Support Program (DSP)
  541.           satellite. Atlantis will also carry additional Department of
  542.           Defense payloads on board.
  543.  
  544.           STS-48  --  Discovery will deploy the Upper Atmosphere Research
  545.           Satellite (UARS) to improve man's knowledge of the atmosphere
  546.           above the troposphere. This satellite will study chemical
  547.           processes acting within and upon earth's stratosphere,
  548.           mesosphere, and lower thermosphere.
  549.  
  550.           STS-42  --  Atlantis on the first International Microgravity
  551.           Laboratory (IML-01). Housed in a Spacelab long module, this
  552.           mission will be devoted to material and life sciences studies.
  553.  
  554.                                     *   *   *   *
  555.  
  556.                Also, NASA's newest shuttle orbiter, Endeavour, is scheduled
  557.           to be delivered to Kennedy Space Center early next summer.
  558.  
  559.                Endeavour will arrive at KSC atop NASA's newest modified 747
  560.           Shuttle Carrier Aircraft. Endeavour's first flight will be in May
  561.           1992 on Space Shuttle mission STS-49, a mission to retrieve,
  562.           repair and redeploy a communications satellite for the
  563.           International Telecommunications Satellite organization
  564.           (INTELSAT). STS-49 will also feature the first extravehicular
  565.           activity by man since return to flight in 1988.
  566.  
  567. ------------------------------
  568.  
  569. End of SPACE Digest V13 #010
  570. *******************
  571.